Kill Line 1


Kill Line 1 :

(n.) Drilling. A high-pressure pipe leading from an outlet on the BOP stack to the high-pressure rig pumps. During normal well control operations, kill fluid is pumped through the drillstring and annular fluid is taken out of the well through the choke line to the choke, which drops the fluid pressure to atmospheric pressure. If the drillpipe is inaccessible, it may be necessary to pump heavy drilling fluid in the top of the well, wait for the fluid to fall under the force of gravity, and then remove fluid from theannulus. In such an operation, while one high pressure line would suffice, it is more convenient to have two. In addition, this provides a measure of redundancy for the operation. In floating offshore operations, the choke and kill lines exit the subsea BOP stack and run along the outside of the riser to the surface. The volumetric and frictional effects of these long choke and kill lines must be taken into account to properly control the well. See: Blowout Preventer, Bop Stack, Choke Line, Well Control. 

No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved