Planning Assumptions 3


Planning Assumptions 3 :

Parameters that are expected and used as a context, basis, or requirement for the development of response and recovery plans, processes, and procedures. If a planning assumption is not valid for a specific incident's circumstances, the plan may not be adequate to ensure response success. Alternative methods may be needed. For example, if a decontamination capability is based on the planning assumption that the facility is not within the zone of release, this assumption must be verified at the beginning of the response