Preliminary Hazard Analysis (PHA) 2
Preliminary Hazard Analysis (PHA) 2 : Disaster Management. As described in NHB 1700. 1(V1-A) and this document. The PHA is to identify safety-critical areas, to identify and evaluate hazards, and to identify the safety design and operation requirements needed in the program concept phase (NSTS 22254)