Preliminary Hazard Analysis (PHA) 2


Preliminary Hazard Analysis (PHA) 2 : Disaster Management. As described in NHB 1700. 1(V1-A) and this document. The PHA is to identify safety-critical areas, to identify and evaluate hazards, and to identify the safety design and operation requirements needed in the program concept phase (NSTS 22254)
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved