Proved Developed Reserves


Proved Developed Reserves : Proved Developed Reserves are those Proved Reserves that can be expected to be recovered through existing wells and facilities and by existing operating methods. Improved recovery reserves can be considered as Proved Developed Reserves only after an improved recovery project has been installed and favorable response has occurred or is expected with a reasonable degree of certainty. (See Developed Reserves) (SPE). Developed reserves are expected to be recovered from existing wells, including reserves behind pipe. Improved recovery reserves are considered developed only after the necessary equipment has been installed, or when the costs to do so are relatively minor. Developed reserves may be sub-categorized as producing or non-producing. (SPE)