Risk Control 09


Risk Control 09 : The Risk associated with the hazardous event under study is adequately controlled, by the reduction of severity and / or likelihood, via the application of engineering and/ or administrative hazard controls. Anything that mitigates or ameliorates the risk
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved