Run 09


Run 09 : The area of pavement selected for coverage in a single continuous operation of the sprayer, profiler, stabiliser or paver. The area of pavement selected for coverage with bituminous slurry during a single continuous operation of the paving unit
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved