Test 3


Test 3 : An activity that is performed to evaluate the effectiveness or capabilities of a plan relative to specified objectives or measurement criteria. Types of tests include: Desk Check, Peer Review, Structured Walkthrough, Standalone Test, Integrated Test, and Operational Test. Note: The types of test listed are not exhaustive and the names given tend to vary from country to country. The examples above are those most typically used in North America. Unlike a rehearsal, a test can be a pass/fail evaluation of infrastructure (computers, cabling, devices, hardware) or physical plant infrastructure (building systems, generators, utilities) to demonstrate the anticipated operation of the components and system. A test of this nature will demonstrate whether these parts of the Business Continuity Plan are fit for purpose