Back Up 2


Back Up 2 :

(vb.) Well Workover and Intervention. To hold one end of a threaded connection while the other is turned to make up the joint. To ensure a secure connection, many types of threaded joints are made up to specific torque requirements in oil- and gas-well applications. This process requires the controlled application of force to the rotating component and a means of stabilizing and securing the corresponding stationary component to which it is being connected

No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved