Workover 3 : Operations on a producing well to restore or increase production. A workover may be performed to stimulate the well, remove sand or wax from the wellbore, to mechanically repair the well, or for other reasons
EESiFlo North America, Terminology and Glossary: Natural Gas Terms, Pennsylvania, USA 2002. flowmeterdirectory.com/flowmeter_terminology, (Nat Gas - Amer) {569}