Workover 3


Workover 3 : Operations on a producing well to restore or increase production. A workover may be performed to stimulate the well, remove sand or wax from the wellbore, to mechanically repair the well, or for other reasons
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved