Behind Pipe


Behind Pipe : If a well drills through several pay zones and is completed in the deepest productive reservoir, casing is set all the way down to the producing zone. Viewed from (a perspective) inside the borehole, reserves in the shallower pay zones up the hole are behind the casing
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved