Benefit Cost Ratio (BCR)


Benefit Cost Ratio (BCR) : Result of the BCA. The BCR is determined by dividing the projects benefits by its costs. A BCR equal to or greater than 1.0 indicates that a project is cost-effective. A BCR lower than 1.0 indicates the project is not cost-effective