Capacity Factor (Gross)


Capacity Factor (Gross) :

The ratio of the gross electricity generated, for the time considered, to the energy that could have been generated at continuous full-power operation during the same period

No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved