Casing 04


Casing 04 : Natural Disaster. Metal pipe inserted into a well bore and cemented in place to protect both subsurface formations (such as ground water) and the wellbore. A surface casing is set first to protect groundwater. The production casing is the last one set. The production tubing (through which hydrocarbons flow to the surface) will be suspended inside the production casing
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved