Bitumen Production Facilities and Equipment


Bitumen Production Facilities and Equipment :

For all primary, enhanced oil recovery (EOR), steam assisted gravity drainage (SAGD), cyclical steam stimulation (CSS) and other thermal in-situ Projects, this may include equipment at or near the producing wells including pump jacks, storage for chemicals, supplies and additives, chemical injection facilities, water injection facilities, additives injection facilities, steam injection facilities, diluent blending, metering and measurement equipment and bitumen storage tanks. Includes all administration buildings, operations offices, on-site housing, cafeterias, recreation facilities, warehouses, training facilities, maintenance and fabrication shops, wash bays, emergency services buildings, permanent camps, etc. May also include all or an allowable portion of any off project buildings and structures directly attributable to the Project in accordance with the Regulations. Includes all on or off-road vehicles, buses, snow clearing equipment, ski-doo’s, aircraft, helicopters, boats, barges, fuel trucks, fire protection equipment, etc. dedicated to the Project or allocated portions of similar equipment

No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved