Concentric Operations 2


Concentric Operations 2 : Well operations conducted using small diameter tubing inside conventional tubing or tubingless completions, normally with the Christmas tree in place and using a small rig or hoisting unit. (RP 57)
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved