Conductor Pipe 3


Conductor Pipe 3 : The first string of casing run, usually to keep rocks or dirt out of the wellbore. It is usually not cemented in place. It may be jetted in, driven in, drilled in or installed in an excavated hole
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved