Cost 05
Cost 05 : Means the measurable economic losses due to failures, such as the loss of crops that not irrigated on time or the production in a factory, and any other loss incurred by failure to supply an adequate quantity of good quality water at the time it is required. Losses are very difficult to measure and quantify, especially those associated with the quality of life of urban consumers. Engineering