Deadline 2


Deadline 2 : The end of the drilling line which is not reeled onto the hoisting drum of the rotary rig. This end of the drilling line is anchored (usually to the derrick substructure) and does not move as the traveling block is hoisted, hence the term deadline. (RP 54)
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved