Design Life 1 : Maximum anticipated operational years of service for the platform, i.e., the period of time from commencement of construction until removal of the structure. (RP 2T)
The Mudblogger (Oilfield, Energy and Related Photographs), Oil Field Glossary, TX, USA 2014. http://mudblogger.com/oilfield-glossary/, (Oil - Amer) {777}