MATTA : See: MATerials Testing Apparatus maximum change: The termination of a green aspect in a traffic-actuated signal controller, which occurs upon the expiration of the maximum running period
Peter Milne and Kieran Sharp, ARRB Group, and Bob Ungers, consultant, Austroads Glossary of Terms (4th Ed.), Austroads Ltd., Sydney, NSW, Australia 2010. http://www.bicyclensw.org.au/files/u1/Austroads_Gl ossary_of_Terms_4th_edition.pdf (Road Trfc and Transp Sfty - Brit) {529}