Stand 9


Stand 9 : When tubing is pulled from a well it will often be pulled in multiple joint lengths, often in three-joint lengths of up to ninety-feet. These multiple joints of tubing are called "Stands" and are stacked in the rig during the "trip"
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved