Cement 10


Cement 10 : To fix the casing firmly in the hole with cement, which is pumped through the drill pipe to the bottom of the casing and up into the annular space between the casing and the walls of the well bore. After the cement sets (hardens) it is drilled out of the inside of the casing. The casing is then perforated to allow oil and gas to enter the well
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved