Choke Line 1 : (n) A line, or pipe, that runs from the blowout preventer stack to the choke manifold through which fluid from the hole is flowed when the well is shut in with the blowout preventer
US Department of Labor, Occupational Safety & Health Administration (OSHA), Oil and Gas Well Drilling and Servicing eTool, Washington, DC. This is an abridged version of the Dictionary of Petroleum Terms provided by Petex and the University of Texas Austin, USA 2001. http://www.osha.gov/SLTC/etools/oilandgas/glossary _of_terms/glossary_of_terms_a.html, (Oil Well Drilling Sci and Tech - Amer) {492}