Curing 7


Curing 7 : In concrete application, the process in which mortar and concrete harden. The length of time is dependent upon the type of cement, mix proportion, required strength, size and shape of the concrete section, weather and future exposure conditions. The period may be 3 weeks or longer for lean concrete mixtures used in structures such as dams or it may be only a few days for richer mixes. Favorable curing temperatures range from 50 to 70 degrees Fahrenheit. Design strength is achieved in 28 days
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved