Cycle Time, Drilling-Fluid


Cycle Time, Drilling-Fluid : The time of a cycle, or down the hole and back, is the time required for the pump to move the drilling fluid in the hole. The cycle in minutes equals the barrels of drilling fluid in the hole divided by barrels per minute. (Bul 10C, Bul D11)
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved