Earthworks 9


Earthworks 9 : The remodelling of the existing ground profile to facilitate the construction of a road or railway at appropriate gradient and alignment. The use of earthworks can be as a result of the road/railway being above existing ground i.e on embankment, or below the existing ground and therefore in cutting
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved