Frm Ii


Frm Ii : The new high-flux neutron source FRM-II is constructed as a reactor to replace the Munich Research Reactor FRM which has been in operation since 1957. First criticality on 2nd March 2004, full power on 24th August 2004. Based on its sophisticated technical concept, the FRM-II will achieve a useable neutron flux 50 times higher at a reactor power (20 MW) five times higher than that of the FRM. A large-scale heavy-watermoderator tank is used to establish this high flux in a considerably greater usable volume and practically only by slow neutrons which are particularly well suited for utilization
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved