Hose Lay 11


Hose Lay 11 :

First Water: The pumps on fire trucks don't help if there's not a skilled person operating the controls. This race pits teams against the clock to see who can get a steady stream of water to the deluge gun (on the end of the hose) the quickest. The operator starts 10 feet from the pumper without the pump in gear, the operator must engage the pump, and pull a draft and have a working stream quickly. The fastest time for this event wins, judging is usually broken up in classes for centrifugal, piston, and rotary gear pumps. Another variant is Bracket pumping where the operator guesses how long it will take him to perform the same tasks, his score is the difference in seconds from his guess to his actual

No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved