Lifting Frame 1


Lifting Frame 1 :

(n.) Well Workover and Intervention. A lifting device used when performing coiled tubing operations from a semisubmersible rig or drillship. The coiled tubing injector and pressure-control equipment are positioned within the lifting frame, which is attached to the flow head and running string and supported by the traveling blocks. This configuration enables the heave-compensation system of the rig to counteract the vessel motion. See: Coiled Tubing, Traveling Block

No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved