LOP (rock mechanics) 2


LOP (rock mechanics) 2 : Leak off point. The departure from the straight line of a limit test on a wellbore. Usually from at leakoff test after casing is set and before drilling ahead
No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved