Mosquito Bill 1


Mosquito Bill 1 :

(n.) Production Testing. A tubular placed at the bottom of the subsurface sucker-rod pump and inside the gas anchor to drive the formation fluid with little or no gas into the pump. See: Gas Anchor

No records Found
afaatim.com copyright © April 2016 Dr.K.R.Kamaal. All rights reserved